Project:
City Hospital Bridge
Short Description:
This replacement footbridge over the railway at Belfast City Hospital was 29m span and was fully welded in on assembly. We installed stainless steel mesh infill panels in the triangular gaps between the diagonal members.
Location:
Belfast
Principal Contractor:
Graham Construction
Consulting Engineer:
RPS
Categories